Critical Path Method

 Critical Path Method

Critical path method is a technique used in project scheduling. It is a longest path of sequenced activities in scheduling which has to be completed within time to avoid any delays.

Steps in CPM:

1. Define project and prepare work breakdown structure.

2. Develop relationship among activities and decide predecessors and successor activities,

3. Draw network connecting all the activities.

4. Assign Time and cost estimates.

5. Compute longest time path, this is called critical path.

6. Use this network to plan, schedule and control project.





 